Installation

Installation Steps

Immerspa Installation

 
Step 1 of an inground spa installation

01

Excavate a hole

Dig the hole 8–12″ wider than the footprint of the spa and a minimum of 41″ from the desired top of the spa. Be sure to add space for any finishes to the edges like coping.

02

Prepare the hole

Install the filter cloth and weeping tile around the outer edge of the hole. Add a minimum 6″ base of 3/4″ clear stone.
Step 2 of an inground spa installation
Step 3 of an inground spa installation

03

Lower the spa in and level

Lower in the spa and make sure it’s at the desired height and level. Tighten the hoses connected to the pump and connect the electricity.

04

Backfill and connect

After checking the base to ensure it is level and the desired height, begin filling with water to stabilize the spa.
Step 4 of an inground spa installation
Step 5 of an inground spa installation by Immerspa

05

Fill with water and enjoy!

Fill the tub about 1/3 full before beginning to backfill with 3/4″ clear stone. Fill the spa up to about 2–3″ below the top height of the spa.

Finish your surrounding surfaces as you like. A variety of elements works well – natural stone, rockeries and built up gardens, maybe even a privacy wall for an added secluded feel. Fill your pool, step in and enjoy…

Find a Contractor near you

Immerspa works with hundreds of installers throughout North America, The Caribbean and Mexico. If you do not see a contractor on the map, we will work with you to find the perfect fit.

By engaging the services of a contractor listed on the ImmerSpa website as a Contractor Partner, you acknowledge and agree to the following terms and conditions

CONTACT US

For more information or to order, Call 1 (844) 663-7772 or email info@immerspa.com.
Immerspa Lead Form

traditional
INGROUND SPAS

MODERN
INGROUND SPAS

COCKTAIL
POOLS

Close
Close
Sign in
Close
Cart (0)

No products in the cart. No products in the cart.





Select your currency
CAD Canadian dollar